My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07093
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:04:11 PM
Creation date
11/18/2007 8:29:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980251
IBM Index Class Name
Inspection
Doc Date
3/13/2006
Doc Name
Unresolved Problems
From
DMG kap
To
Park County Road and Bridge
Inspection Date
9/15/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4J <br />MINE ID # OR PROSPECTING ID #: M_1977-'tis <br />INSPECTION DATE: Qll4/ns INSPECTGR~S INITIALS: KAP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Berard. The inspector noted on the previous page should be notified of all <br />corrective actions token. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />3. During the inspection it was discovered that the site has not been fully reclaimed and 12 / 1 y 04 <br />during the review of records, it was discovered that the Operator had notified the Division <br />that reclamation of the site commenced in the fall of 1995. This is a problem related to <br />Rule 3.1.3 of the Construction Materials Rules and Regulations which states that all <br />reclamation shall be carried to completion by the Operatorwith all reasonable diligence, <br />and each phase of reclamation shall be completed within five ISI Years from the date the <br />Operator informs the Board or Office that such phase has commenced unless extended by <br />the Board or Office. <br />PB or PV: <br />TOPIC(S): ~_ <br />Corrective Action: Submit a technical revision to the narmit identifying what measures will be - - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.