My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC06381
DRMS
>
Back File Migration
>
Inspection
>
INSPEC06381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:02:35 PM
Creation date
11/18/2007 8:26:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998022
IBM Index Class Name
Inspection
Doc Date
11/9/2000
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
10/19/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 31 • <br />MINE ID k OR PROSPECTING ID rr M-1998-022 <br />INSPECTION DATE 10-19-2000 <br />INSPECTOR'S INITIALS SSS <br />The following problems IPB) and/or possible violations IPVI land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The staging area and mine bench are larger than approved in the permit. <br />CORRECTIVE ACTION: <br />Address these problems through submittal of a revision application, received by DMG <br />no later than 11-30-2000 specifying larger dimensions for these areas, and <br />reclamation of these areas that do contain a mixed soil/rock surface. <br />2. There is a near vertical highwall on the north end of the staging area. <br />CORRECTIVE ACTION: <br />The oversteepened highwall must be reduced to a 2:1 grade by no later than 11-30- <br />2000. <br />3. The benched surfaces of the permit area and the staging area highwall contain <br />enough soil that surface runoff will most likely contain sediment that could be <br />discharged off-site. <br />CORRECTIVE ACTION: <br />The stormwater control features described in the stormwater control permit must be <br />installed no later than 11-30-2000. <br />4. <br />5. <br />CORRECTIVE ACTION: <br />CORRECTIVE ACTION: <br />11-30-2000 <br />PB or PV: PB <br />TOPICISI: MP <br />RS, FN,_ <br />11-30-2000 <br />PB or PV: PB <br />TOPICISI: BG <br />ST, FN,_ <br />1 1-30-2000 <br />PB or PV: PB <br />TOPICISI: HB <br />PB or PV: <br />TOPICIS) <br />PB or PV:_ <br />TOPICISI <br />
The URL can be used to link to this page
Your browser does not support the video tag.