My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC06371
DRMS
>
Back File Migration
>
Inspection
>
INSPEC06371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:02:34 PM
Creation date
11/18/2007 8:26:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980003
IBM Index Class Name
Inspection
Doc Date
11/13/2002
Doc Name
Inspection Report
From
DMG
To
Gary K. and Sarah L. McNulty
Inspection Date
10/28/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 01a <br />Date : 11/12x1002 <br />User : SSS <br />State :Colorado Permifrob# : M-1980-003 <br />County :Eagle Abbreviation :none <br />Site :McnultyCinderPit Filename :M003-01a <br />Agency or organization name :DMG <br />Permit or other job action :Routine Reclamation Cost Estimate Update <br />Task description : BacMill highwall from bottom to top to 2:1 slope <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8SU Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 33.330 <br />Shift basis : 1 perday <br />Data source : (CRG) <br /> Utilization <br />Ownershipcost/hour : $49.50 NA <br />OperatingcosUhour : $65.98 100 <br />Ripper op. cost/hour : $0.37 5 <br />Operator cosUhour : $27.99 NA <br />Total unit wsUhour : $143.85 Total fleet cosUhour : $143.85 <br /> <br />Swell <br />LCY factor : NA <br />Source of estimated volume :Assume backfill with north waste <br />Source of estimated swell factor : NA <br />- - <br />~HOURLY PRODUCTION Job Condition Corr <br />Average push distance : 100 feet <br />Unadjusted howdy production : 852.6 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Cinders <br />5.50 % (I <br />7,500 feet <br />950 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.131 /LCY <br />330'L x 100'W x 40'H <br />Operator.skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.89 <br />Altitude : 1.00 <br />Material weight : 2.42 <br />Blade type : 1.00 <br />Net correction : 1.29 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />Loose <br />volume : 33,330 LCY <br />Source <br />1100.10 LCY/hr <br />x,100.10 LCY/hr <br />30.30 Hours <br />$4,358 <br />
The URL can be used to link to this page
Your browser does not support the video tag.