Laserfiche WebLink
(Page 3) <br />MINE ID p OR PROSPI=CTING ID tf M-1980-143 <br />INSPECTION DATE 6-.30-2000 INSPECTOR'S INITIALS SSS <br />The following problems IPBI andlor passible violations (PV) land suggested corrective actions) were identified during this <br />inspection. The probl~;ms should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The highwall appears to be longer than the approved 300 feet. 9-30-2000 <br /> PB or PV: PB <br />CORRECTIVE ACTION: TOPICISI: MP <br />Reduce the highwall to 300 feet or less in length. Perform reclamation tasks on the BG , FN , _ <br />backfilled highwall area as specified in the approved permit. Submit photographic <br />documentation of completion of earthwork by September 29, 2000. Revegetation <br />tasks should be performed at the time specified in the permit <br />2. Sediment com:rol structures have not been adequately maintained. 8-31.2000 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPICIS): HB <br />Reconstruct sediment control on site to ensure all stormwater runoff from disturbed SC , _, _ <br />areas of the site passes through an approved sediment control structure prior to <br />discharge from the site. Maintain these structures so they function as designed. <br />3. Musk thistle has infested the site. 10-31-2000 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPICISI: RV <br />Perform weed control measures and submit a weed control plan that will be _, _, _ <br />implemented in future years to maintain control of weeds on the site, particularly <br />targeting noxious weeds such as musk thistle. <br />4. Some piles of material appear to have been imported and dumped on site. 8-31-2000 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPICISI: AR <br />For any fill material that is imported and used as permanent backfill, Neil's Excavation _, _, _ <br />must submit a notice that includes the information required by Rule 3.1.5(91• <br />