My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC06194
DRMS
>
Back File Migration
>
Inspection
>
INSPEC06194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:02:06 PM
Creation date
11/18/2007 8:25:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978168
IBM Index Class Name
Inspection
Doc Date
4/11/2000
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
3/31/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINE ID 1/ Oii PROSPECTING ID 1l M-1978-168 <br />INSPECTION DATE 3/31/00 <br />(Page 31 <br /> <br />INSPECTOR'S INITIALS RCO <br />The fallowing problems (PBI and/or possible violations IPVI (and suggested corrective actions) were identified during this <br />inspection. --he problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The trite exhibits several healthy patches of knapweed, some of which have existed 5 3! 1 /00 <br />for t~vo or more years. This is one of the noxious weeds listed on the State weed PB or PV: PB <br />law, and is required to be controlled. These infestations pose a threat of making TOPICISI: RV <br />recta nation of the site mare difficult. , _ <br />CORRECTIVE ACTION: <br />The operator must prepare and submit a noxious weed control plan, and a written <br />comr~itment to implement the plan. (lf a plan already exists for the site, a new one <br />need not be prepared, only submitted.) The plan and commitment must be received <br />at this office by the date shown at right. <br />2. None <br />PB or PV: <br />CORRECTIVE ACTION: TOPICISI:_ <br />3. None. <br />PB or PV: <br />CORRECTIVE ACTION: TOPICISI:_ , _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.