Laserfiche WebLink
~.ambert attb ~ggutiateg <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: <br />PROJECT NAME: <br />PROJECT LOCATION: <br />CLIENT: <br />CONTRACTOR <br />M97042MT <br />West Elk Mine <br />Somerset, Colorado <br />Mountain Coal Company <br />Beavers Construction <br />DATE: Tuesday, 5-13-97 <br />TECHNICIAN: Glendening <br />WEATHER CONDITIONS: Sunny <br />WORK REQUESTED:Density tests <br />FOREMAN: Mr. Colby Reid <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE AND REMARKS <br />I arrived at the project site at 10:95 A.M. as requested by Mr. Colby Reid. I <br />performed soil density tests as requested by Mr. Reid of material being placed for <br />gob pile fill, using nuclear soil density test methods. Please refer to the test <br />results sheets for approximate test locations and test results. The test results <br />were verbally given to Mr. Reid of West Elk Mine at the time of our site visit. <br />The the test locations were determined by Mr. Reid. The test results indicate only <br />the relative compaction and soil moisture content of the material tested at the <br />elevation and location tested at the time of our site visit. <br />P. O. BO% 7906 P. O. EO% 005 Z1 ~ BODO OR. <br />GRAND JUNCTION, CO E7504 MOHTROSE,CO E1~03 DURANGO,CO E1701 <br />(970) 7~bl50! (070) 3~9Q7 St (9701290.9095 <br />