Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1979-097 <br />INSPECTION DATE 03/07/06 INSPECTOR'S INITIALS ESC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROSLSNS/POSSIBLB VIOLATION3 <br />AND <br />DATE <br />PROBLEM: <br />The operator has not constructed the lateral berm stabilization <br />measures approved in TR-03. Failure to install such structures PB or PV:PV <br />is a possible violation of C.R.S. 34-32.5-116 (1)for failure to TOPIC (S):MP <br />follow the approved reclamation plan. 04-01-06 <br />CORRSCTIVB ACTIONS <br />The operator will need to install the lateral berm conveyance as <br />approved in TR-03 by April 1, 2006. <br />