Laserfiche WebLink
Area 41: Stockpond 41a was in good repair. Some downcutting in the ditch upelope of atockpond 41 a <br />has occurred. This is of limited extent and does not necessitate immediate maintenance. Stockponds <br />41b and 41c appear in good condition and hold water. Snowbanks are still in evidence upelope of <br />stockpond 41 c. Stockpond 41d full, discharging cleaz. No problems noted with stockpond 41f, <br />discharge estimated at >20 gpm. Check dams between stockpond 41 f and 41g are functioning well. No <br />problems noted with stockpond 41g. Stockpond 41h has considerable flow flowing in yet appears that <br />water is draining out the bottom of the pond. Water level is not rising in the pond in spite of <br />considerable snowmelt flowing into the pond. Flow appears to be draining into a spot at the NW corner <br />of the pond embankment. No seepy areas were noted on the outslope of the embankment. No saturated <br />areas or spoil springs were observed along flte Northwest facing slope north of stockpond 41h. T}us <br />area will continue to be visually monitored for evidence of seepage or potential instability. PG41-1 <br />Sec.A is in good condition. No discharge from pond 41h is reaching this portion of the drainage. <br />A gully leas Formed South east of pond A. This gully is oriented NNW and runs approx. 200 ft. This <br />feature appears to have formed along a contour furrow and runs perpendicular to the elope. BLrding in <br />of this feature needs to be enacted se a maintenance repair. Seeding with the approved seed mix of the <br />bladed segment should occur following this repair. <br />f€: A herd of approx. 80 elk passed by while inspection was in Area 41. Sharptailed grouse was <br />flushed up near PG51-1 Sec. A. <br />