My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC05261
DRMS
>
Back File Migration
>
Inspection
>
INSPEC05261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:59:56 PM
Creation date
11/18/2007 8:20:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Inspection
Doc Name
COAL INSPECTION REPORT
Inspection Date
4/14/1983
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. <br />III. Comments - Compliance <br />Below are particular issues with regard to any of the above compliance items. Enforcement <br />actions resulting from failure to comply with the Act, Rules and Regulations, and the permit <br />also are identified below. <br />4.05 Hydrologic Balance <br />1. The entire perimeter diversion ditch system was walked during the inspection. It <br />appears that the ditch system has functioned properly, however weeds and sediment <br />have accumulated in some segments, particularly the east side and north side <br />diversions. <br />4.09 Excess Spoil and Development 6Jaste <br />1. To date, waste has been disposed of in old strip pits to the east of the surface <br />facilities area. During the next permit term, the refuse fill will be expanded <br />to the east, north and south. Details and timetables for reclamation of the refuse <br />disposal are being addressed through the permit review process.. <br />2. Approximately 6,000 yd3 of refuse has been placed on the upper northeastern portion <br />of the fill since last fall, but has not yet been graded and compacted. Mr. Reschke <br />has subsequently indicated that grading and compaction would be accomplished this <br />summer. <br />3. As required by Rule 4.09.1(11), upon completion of the above noted grading and <br />compaction, a certified inspection report verifying that the fill has been <br />constructed as specified is to be submitted to the Division. A certification <br />report will be required quarterly during construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.