Laserfiche WebLink
Y <br />. ~ <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />erosional problems at the Bear Creek reclaimed site. The Hubbard Creek reclaimed sites were not <br />inspected due to the slide across the Hubbard Creek road. <br />Signs and Mazkers <br />Mine.ID signs were up at the appropriate locations. Surface disturbance mazkers were present around <br />the mine site. <br />Topsoil <br />There were no erosional problems•observed at the topsoil stockpiles. Topsoil signs were up. <br />Gob Piles <br />The operator has ropgd off the.eastem third of the east gob pile so no new gob can be placed in that <br />section. Several small piles of gob have been placed on the gob pile so that they can dry out before <br />grading and compaction. The upper diversion ditch was functional. <br />No gob has been placed at the west valley fill yet. The upper diversion ditch was functional. <br />Records <br />~" All of the records were in compliance. Please refer to the records checklist that follows. <br />c:\m s97\sanbom\insp0200 <br />2 <br />