My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC05154
DRMS
>
Back File Migration
>
Inspection
>
INSPEC05154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:59:51 PM
Creation date
11/18/2007 8:20:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Inspection
Doc Date
10/23/1987
Doc Name
OSM MINE SITE EVALUATION INSPECTION REPORT
Inspection Date
12/10/1986
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T.1lP fiEFOH'f <br />Cates DeceT.ber 10, 1926 <br />Pla:c(s) Visited Elue P.i.t:on Ccal I.1ire in Peonia, Colcrado <br />Discuosion: <br />and extendirq acprovimztely 20 feet aler.3 the diversion. I could not lcr~te a:. <br />other areas of Ponding, t-.cwever, the snc.: cover hampered my searcz. The <br />underdrains lccated in the bench eutslcVe were flrained at the time of cur <br />instection. " <br />'^:e borrow area located directly south of the hig.:all and used to supply mater <br />for bac'.;filling the }:ic::arall eras reclaimed to a slope wricY: did not exceed the <br />dasigreci sloce. <br />Rased upon my in-"ecticn of the site a.d observations ride by the bII.RD, I feel <br />that the nine bench nutslope, the backfilled hichwall, and the borrow area are <br />adeouately reclaimed in accordance with the acproved reclamation plan for Phase <br />1 bond release. T2:e Permanent diversion, howe~~er, is rot adequately reclaimed <br />and is r::;t furcticnirg as desicred as evidenced by the large arount of pcndinq <br />water. The 1•IL,P.D and tre C~r~any engire_r have di=_cussed remedial mr 3sures to <br />be taken by the Cc:rpany w'~en weatrer per,+its. h~RD suc;ested that the Ccsr~any <br />regrade tl_e bend: to achieve a 5% grade into the permzr:ent diversion and regradE <br />t`.e diversion to achieve a 2a grade along the diversion. I corcvr with t`:e <br />I _.TD' s sucgesticn. Tl:e ter5ch outslope has not s'ra.•n ary movement other tinan <br />e~cpectEd cue to settlement. The outsloe is surveyed grarterly and the <br />Piezecmeter netc:or'~ is monitored rrnnti•1}~. The cutslocz shows no signs o_° beirc <br />unstable at this tirre. Fowever, a prcP.erly functionir.? Permanent diversion is <br />necessary to insure the future stabili ;• of the outslePe. Therefore, I do not <br />recommend Phase 1 bond release until Blue Rirbon Coal Ccmaany corrects t'-e <br />crainace prcble_-~ of the Permanent diversion. <br />Su.~itted by• a J ~\c,un.1.Q.C. 1 / P g _ <br />Late <br />1^( r <br />I.~a.r ~PS'I 4yr(SO u.. 2 O O <br />Section Chief Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.