Laserfiche WebLink
noted in last month's inspection. Parts were being gathered and stacked for removal. Mr. <br />Thompson indicated that it is likely that an interested party will remove the remaining coal in <br />the silos. This party or individual will provide their own trucks and equipment. which will keep <br />the operator's equipment free to work on other tasks like the RDA. <br />The material pushed into a pile at the coal stockpile #2 remains unchanged since the last <br />inspection. <br />Overall, the site appeared in compliance and good condition for the fall season. <br />Mr Thompson indicated work planned while equipment is on-site includes grading of the <br />RDA and 100-year ditch, pond 8 spillway repair, west portal sinkhole repair, and grading at <br />the development waste pile. <br />