Laserfiche WebLink
Edna Mine, pg.3 <br />The permittee has proposed to use Holistic Resource Management <br />(HRM) practices on portions of the reclamation areas. This would <br />include short duration/high intensity grazing/hoof action of the <br />areas by cattle after broadcast interseedinq of the areas. <br />We concluded the inspection with a review of applicable <br />monitoring records and permitting information. The review <br />included: approved permit from 11-16-91 to 11-16-96 including the <br />7-28-92 Findings Document; bond letter of credit dated 5/3/95 for <br />$7,121,196; rill and gully report dated 6/22/95; quarterly <br />discharge monitoring reports current through 6/95; stormwater <br />management plan and the SPCC plan; quarterly sediment pond <br />inspections were current; annual hydrology report submitted <br />3/20/95 including the annual spring and seep survey; surface and <br />ground water monitoring current through 8/95; blasting records <br />current through 9/8/95; sediment pond and road certifications <br />have not changed since my last inspection; and the 9/21/94 annual <br />sediment pond certifications. <br />Please address any questions concerning this report to Henry <br />Austin at (303) 672-9472. <br />