Laserfiche WebLink
ENVIRONMENTAL ASSESSMENT <br />~ .,,.) SALT CREEK MINING COMPANY <br />--- McCLANE CANYON MINE <br />~• MINING PLAN, AS MODIFIED <br />1. Purpose and Need <br />Salt Creek Mining Company submitted a permit application package (PAP) <br />and request for permit renewal involving the mining of Federal coal at <br />the McClane Canyon mine. Pursuant to 30 CFR 746.14, the Secretary of the <br />Interior must approve, approve with conditions, or disapprove the mining <br />plan, as modified, for the mining of the Federal coal as proposed in the <br />PAP. This document assesses the environmental effects of the proposed <br />mining and reclamation operations and alternative actions available to <br />the Secretary including approval without conditions, approval with <br />conditions, and disapproval of the mining plan. <br />The PAP was submitted on October 17, 1984 to Colorado Mined Land <br />Reclamation Division (HERD) as a renewal of permit application number <br />C-004-80. <br />_ _- __ The McClane Canyon mine is located in Garfield County, Colorado, <br />approximately 20 miles north-of-lsma~n-Colorado~Iighway 139 in Sections• _ <br />~• ~} I5, 16, 21 and 22, Township 7 South, Range 102 West, and has been '' <br />_ ~ operating since 1977. The mine was permitted under the approved Colorado <br />~. permanent regulatory prograco in April 1982. The mining plan for the <br />McClane Canyon mine was originally approved in July 6, 1982. Since the <br />original approval of the mining plan, there have been no mining plan <br />modifications. <br />The permit renewal area associated with this mining plan contains <br />approximatel 248 s all of which are within Federal coal lease <br />C-0125439. <br />NCoY~' Upon approval <br />fRls°mining plan, as modified, the approved mining plan area for the <br />Abp 4~+ McClane Canyon mine will contain approximately 248 acres within Federal <br />~~~~ lease C-0125439. <br />Under this approval, mining is anticipated to proceed until 1988. The <br />PAP indicated that mining operations for the life of the McClane Canyon <br />mine would cease around the year 1988 and would affect approximately 248 <br />acres, all of which are leased Federal coal lands. <br />This document assesses the environmental effects that will result from <br />the approval, approval with a condition, or disapproval of the mining <br />plan, as modified. <br />Salt Creek Mining Company has proposed a room and pillar operation. The <br />underground mining operation principally will utilize room and pillar <br />mining methods. The Cameo coal seam will be mined at a production rate <br />of approximately 80,000 tons per year. All mining and reclamation <br />operations are scheduled to cease around the year 1988. <br />