My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC04706
DRMS
>
Back File Migration
>
Inspection
>
INSPEC04706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:59:24 PM
Creation date
11/18/2007 8:17:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
Inspection
Doc Date
8/19/2005
Doc Name
inspection
From
dmg
To
Platte Sand & Gravel LLC
Inspection Date
6/2/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID #_ <br />INSPECTION DATE_ <br />INSPECTOR'S INITIALS CBM <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS CORRECTION <br />DATE <br />1 ~ The site entranre crossec_ the Western Muh gal Ditch at the eastern harder of the permit area direr_.tly <br />across from County Road 36. 09 / 30 / 2005 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): MP <br />The operator must provide. by no later than September 30. 2005, an agreement with the Western _ _ - <br />Mutual Ditch Company that indicates that crossing the ditch at this location with a bridge and that the <br />haul road being within 200 feet of the ditch is acceptable to them. <br />2 <br />traverse the nronerty fmm north to south and east to west. 09 / 30 / 2005 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): RD <br />The operator must provide agreements with the company (ies) that own these lines or ap rovable _ _ , <br />crossing road designs protective of the structures in question. in the form of a chance to the g_ermit. <br />by no later than September 30. 2005. <br />3. Mining is taking place in a different location than where the aooroved mans indicate that mining will <br />be taking place. 09 / 30 / 2005 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): MP <br />The operator must file a change to the permit to allow mining in these areas. This change must be BS_ _ i <br />filed with the Division by no later than September 30.2005. The change must indicate where topsoil <br />and overburden will be stockpiled on site and how these stockpiles will be stabilized if they are left in <br />glace for more than one orowina season without being active. <br />4. Mining disturbance at this time totals approximately 64 acres. The approved permit allows only 35 <br />acres of disturbance at any one time (15=plant; 10=mining; 10=reclaimed but not revegetated). 09 / 30 / 2005 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): MP <br />The operator must file a change to the permit to allow this amount of disturbance in this area by no ~ ~ _ <br />later than September 30.2005. Alternatively. the operator may reclaim enough acreage to bring total <br />disturbance acreage to less than the limits allowed by the presently aooroved permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.