Laserfiche WebLink
<br />Technical Revision to the permit and removal of the structure be provided for in the reclamation <br />plan and bond. Section 34-32.5-116 (2) of the Construction Materials Act states that the details <br />of the reclamation plan shall be appropriate to the type of reclamation necessary to a.thieve the <br />proposed postmining land use.(Also see Section 34-32.5-116 (4) (r) of the Act and Rule 3.1.11 of <br />the Construction Materials Rules which speak more specifically to buildings related ';o the <br />mining operation.) <br />5)I have no problem with the alluvial material you describe as lying on the sides of tl~e new haul <br />road being moved into the permitted azea, stockpiled and stabilized so as to be available for use <br />as growth medium when the site is reclaimed. You must, however, meet the requirements of Rule <br />3.1.5 (9) if you intend to import this material for backfill purposes. <br />If you have any questions on the above, please contact me. <br />Sincerely, <br />-uric-~ G S~-tyPsc.~ <br />James C. Stevens <br />Sr. Specialist <br />Enclosure <br />98NO30 <br />