Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and <br />date of abatement for the violation, previous violations still requiring abatement and the termination of <br />violations cited during previous inspections. <br />No enforcement actions were taken as a result of this inspection. There is one notice of <br />violation that has not yet been fully abated, NOV CV-2004-005. <br />CV-2004-005 <br />Abatement 1: De-water sediment pond and excavate "in-ditch" sump by 5pm. 11/29/04. <br />Abatement 1 was completed and was verified on 12-7-04. <br />Abatement 2: Excavate failed embankment and reconstruct embankment in accordance <br />with approved design and applicable requirements of 4.05.6, 4.05.9(1), 4.05.9(6), and <br />4.05.9(7) by 5pm., 12/3/04. Abatement 1 was completed and was verified on 12-7-04. <br />Abatement 3: Submit P.E. Certification of the reconstructed embankment in accordance <br />with 4.05.9(14) by 12/17/04. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Revised 2/97 <br />