Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimation Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DMG <br />003 State :Colorado <br />07/20/2004 County:Prowers <br />LDO Site :Wiley Pit <br />Permit or other job action :Calculate Reclamation Cost Stages I And lii <br />Task description :Replace 6" topsoil on 12,21 acres <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 631G <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader :NA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />OwnerhipcosUhour: $57.25 NA NA NA NA NA <br />Operating cosUhour : $119.43 NA NA NA NA NA <br />Ripper op.cosUhour. NA NA NA NA NA NA <br />OperatorcosUhour: $25.43 NA NA NA NA NA <br />Unit subtotals : $202.11 NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $202.11 Support : $0.00 Maintenance : $0.00 <br />Total work team costlhour : x202.11 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,849 LCY factor : NA volume : 9,849 LCY <br />Source of quantity take-off :estimated from reclamation plan <br />Source of estimated swell factor :NA <br />PermiUjob # : M-1977-223 <br />Abbreviation :none <br />Filename : M223-003 <br />