Laserfiche WebLink
CIRCES Cost Estimatintt Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 07/20/2004 <br />User : LDO <br />State :Colorado PermiUjob# : M-1977-223 <br />County :Prowers Abbreviation :none <br />Site :Wiley Pit Filename :M223-002 <br />Agency or organization name :DMG <br />Permit or other job action :Calculate reclamation cost for Stages /and 111 <br />Task description :Reduce 3100 1. ft. of 15 ft. vertical p <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $44.07 NA <br /> Operating cosUhour : $66.72 100 <br /> Ripper op.cost/hour: $0.00 NA <br /> Operator cost/hour: $31.83 NA <br /> Total unit cost/hour : $142.62 Total fleet cosUhour : $142.62 <br />_.: <br />MATERIAL QUANTITIES ,: <br />Initial Swell Loose <br />volume : 9,679 BCY factor : 1.230 volume : 11,905 LCY <br /> <br />Source of estimated volume :Estimated /rom reclamation plan <br />Source of estimated swell factor :cat handbook <br />;: <br />HOURLY PRODUCTION > <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 51 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,627.0 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shifUday) <br />Compacted fill or embankment Spoil pile : 0.70 (fnd-mt) <br /> Push gradient : 1.33 (Cat HB) <br />Average push gradient : 15.00 % (neg) Altitude : 1.00 (Cai HB) <br />Average site altitude : 3, 750 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2.550 Ibs/LCY Net correction : 0.56 <br />Weight description <br />Earth - ON packed <br />Adjusted unit production : 917.53 LCY/hr <br />Adjusted fleet production : 917.53 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 12.98 Hours <br />Unit cost : $0.155 /LCY Total job cost : $1,851 <br />walls to 3h ; 1 v <br />8U Horsepower : 310 <br />Shift basis : 1 per day <br />