Laserfiche WebLink
I <br />M95030MT <br />11/17/95 <br />Page Two <br />procedure should be used. This information is not typically <br />reported with the results of the tests. We will report this <br />information on future moisture content-dry density relationship <br />tests performed for your project. <br />The letter requested that during the performance of the field <br />density tests the areas tested should be excavated and the material <br />observed to determine if it visually has an estimated course <br />portion similar to that determined by the laboratory moisture <br />content-dry density relationship test. If it is determined to be <br />different then we will move to a nearby location and perform <br />another test. we will incorporate this technique into our field <br />density test procedures. <br />If you have any questions concerning the geotechnical <br />engineering aspects of your project or if we may be of further <br />I~~ assistance please contact us. <br />•~ ~: <br />••~,,ya Respectfully Submitted: <br />^T ~~'. <br />~~-~" ~; LAM33EART AND ASSOCIATES <br />~, <br />~r <br />'• '~•L I ~ • ,~ <br />an W. J ston, P. E. <br />NWJ/nr <br />Reviewed by: `'~ ~" <br />~: <br />- - •. ' • '- <br />;;. <br />ni L E. <br />~Lam6ert ana ~,o,~ociateo <br />CONSULtINO GEOTECNNICAL ENDIMEEIIS wND <br />MwTERIwL TESTIND <br />