My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC04263
DRMS
>
Back File Migration
>
Inspection
>
INSPEC04263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:59:01 PM
Creation date
11/18/2007 8:15:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
8/23/2000
Doc Name
COAL INSPECTION REPORT
Inspection Date
8/16/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />III. TS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />The other topsoil stockpiles also were protected by straw bales. There were no signs of gullying <br />on any of the topsoil stockpiles. <br />HvdroloQy <br />The water level in pond C was just below the primary dischazge tube. The water did not have the <br />blackish color that it had during the last inspection. Ponds B and D were dry. Pond inslopes and <br />ou[slopes were stable. Pond spillways were functional. <br />Diversion ditches and culverts were operational. The operator was draining water from the <br />sediment treatment facility at the water tank into the diversion ditch that runs behind the water <br />tank bench. Because water should be kept off of the bench fill, the operator will pump the water <br />back into the water tank rather than dischazging it down the ditch. <br />Straw bales were functional around the mine site and at the pump house. There were no erosional <br />problems anywhere around the mine site. <br />The seep area on the west side of the water tank bench was wet but not flowing. The seep on the <br />west side along the access road to the water tank bench was also wet but not flowing. Cattails are <br />growing in this area. <br />Gob Pile <br />The haul road tot he gob pile was in good shape. The culvert and swale, as one enters the gob <br />pile, were functional. The upper diversion ditch and west collection ditch were functional. There <br />were a few small gob piles in the back of the gob bench. The small piles will be graded and <br />compacted later. There was positive drainage on the pile. <br />Records <br />All of the records were found to be in compliance. Please refer to the records checklist that <br />follows. <br />c:\ms97\bo w ie 2\i n sp0800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.