Laserfiche WebLink
RECLANATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (H): <br />____________ <br />1. EARTHNORK -DRAINAGE CONTROL SYSTEM INSTALLAT IONJREMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (!I: <br />J. EARTH'.IORK - TOPSOILISUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cast (S) <br />5 ~ Replace 29,282 c-y. x 1.T2 swell x f0.A05/c.y. ~ 513,282 <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (J): f13, 282 <br />