Laserfiche WebLink
<br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />EXCESS SPOIL AND DEVELOPMENT WASTE <br />Construction and regrading is continuing on the west and east <br />facing slopes of the refuse pile. The underdrain and french drain <br />(TR#66) on the west side are completed. MCC has photographs of the <br />construction of the underdrain. The 100-year ditch on the <br />southwest side of the pile has been relocated to a higher elevation <br />(to allow for disposal of coal refuse) and rip rapped. The slope <br />of the ditch steepens considerably as it comes off the pile and <br />flows into D2R-lA. This steep section of the ditch should be <br />watched for signs of erosion. <br />007INS.927 <br />