Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement <br />and date of abatement for the violation, previous violations still requiring abatement and the <br />termination of violations cited during previous inspections <br />This was a partial inspection conducted by Janet Binns, of Colorado Dive~j i of Minerals and Geology. Mr. <br />Forrest Luke of Trapper Mining Inc accompanied the inspection. cezr~r~„ r~eslicn. The weather <br />was cool and windy with sporadic snow flurries. The snow pack has melted off. The mine site has received <br />approximately 0.015 inch of precipitation in the month of April, according to the operator. The mine is an <br />active surface mine. <br />Roads: LOM haul road was watered during the inspection. Haul roads throughout the mine site remain in <br />good condition. Grading and ditch cleaning had occurred along the main haul roads. Gravel had been <br />placed in some azeas this spring. All roads were dry enough to drive on. Johnson Drainage sump on both <br />south and north sides of the LOM haul road need clean out this construction season. The culvert is <br />approximately'/, to 1/3 filled with sediment. <br />HvdrologSc Balance: <br />Ponds on the northern portion of the mine were inspected: <br />Pond Name NPDES # Condition Maintenance needed <br />Oak #1 017 Holding water to spillway. Not None <br /> discharging <br />Oak #2 dry None <br />Sage #1 and 2 016 Dry, well vegetated None <br />Grouse #2 015 Holding a small pool of water, not None <br /> discharging. Embankment well <br /> ve elated. <br />Grouse #1 Holding water. Water level below None <br /> s illwa ,not dischar in . <br />East Pyeatt fi3 011 Holding water just below discharge Headcutting of outtall <br /> level. identified in March <br /> ins ection. <br />East Pyeatt #1 & 2 Both holding water None <br />West Pyeatt #2 dry None <br />West Pyeatt #1 Water approx. 2 tt. below spillway None <br />Johnson 10R 001 Holding water. None <br />Johnson 9 Full pool of water. Discharging in Remove blue tarp from <br /> o en channels illwa and <br />Johnson 8 Full pool of water. Discharging to None <br /> o en channels iliwa <br />Johnson 7 Full pool. Discharging to open Downcutting of ditch from <br /> channel spillway. Is delta part of Ash haul road needs <br /> design? brush pack or other <br /> means to reduce <br /> downcuttin . <br />Johnson 6 Full pool of water. Decant through Watch burrowing on <br /> dro structure. embankment outslo e <br />Ute Holding water. Below spillway. None <br /> See on east side of and is dam <br />Deer Small pool of water in pond. none <br />Elk Holding water. Not discharging. none <br /> Embankment and ditches remain in <br />