Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: nn_tvn-sus <br />INSPECTION DATE: 9/t S(15 <br />INSPECTORS INITIALS: KAP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce theirseverity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1• 11/ 15/OS <br />During the inspection, it was discovered that there were no boundary markers identifying <br />the permit boundary at the site. The is a problem related to Section 3.1.12 12) of the <br />Construction Materials Rules and Regulations for failure to mark the boundaries of the <br />affected area by monuments or other markers that are clearly visible and adequate to <br />delineate such boundaries. <br />PB or PV: 3B_ <br />TOPIC(S): ~~ <br />CorrPCtive Action: Place aoarapriatP boundary markers at the site within 30 days of r~ceiot - - - <br />nf this inSpPCtinn rapnrt. anti sand nhntns to tha f)ivisinn fnr varificntinn. <br />2• 12/ 15/ OS <br />During the inspection, it was discovered that the slope on the north side of the pit is steeper <br />than the slopes designated in the approved reclamation plan. This is a problem related to <br />Rule 34-32.5-1 16 of the Colorado Revised Statutes, for failure to perform the prescribed <br />reclomation plan. <br />PB or PV: ~_ <br />TOPIC(S): ~: <br />CnrrPrtiva Actinn• Gm~IP tha nnrfh slnpg of the pjf to n grnda of 3H•1 V nr IP.SC and send <br />photos of the slope to the Division of Minerals and Geology within sixty (6Q~ days of receipt of <br />