Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and date of abatement for the <br />violation, previous violations still requiring abatement and the termination of violations cited during previous inspections. <br />Violation CV-2005-005 was issued on May 13, 2005, in two parts. Required abatements of the two parts, <br />including an option in Part 2, are described (abbreviated) with required abatement dates indicated as follows: <br />Part Descri tion Abatement Date <br /> <br />1 Remove topsoil a setback distance from the sediment control ditch at the 18- <br />Ri ht Ventilation Shaft site. Abated. Ins ected June 14, 2005. 13 June 2005 <br />2a Set back to soil windrows. O tion 2b selected. N/A <br />or <br />2b _ Relocate windrows of topsoil to topsoil storage~iles. _ _ 5 January 2006 <br />Work on part 2b had been started. <br />No (new) enforcement actions were taken during this inspection. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />C-1982-056. CC Inspection of November l5, 2005 Page 7 of 7 pages. BGW <br />