My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-09-13_INSPECTION - M1981302
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1981302
>
1995-09-13_INSPECTION - M1981302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 2:53:33 PM
Creation date
11/18/2007 8:10:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Inspection
Doc Date
9/13/1995
Doc Name
MLRB PN M-81-302 PROBLEMS CORRECTIVE ACTION
From
WESTERN MOBILE
To
DMG
Inspection Date
12/22/1994
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEEPE PIT <br /> Remaining Reclamation <br /> Stage l East Side(12 acres) has been reclaimed 0 <br /> Dismantle plants <br /> 4 laborers, 5 days/week for 6 weeks at$9.00/hr $ 8,640 <br /> Rental of 2 cranes for 2 weeks at$80.00/hr 12,800 <br /> Plant removal by recycler 0 <br /> Removal of concrete foundations <br /> Remove with track backhoe and loader <br /> +\- 200 cy at$40.00/cy 8,000 <br /> Grading of 26 acres of plant/process area <br /> with blade at 3 hours/acre at$52.001hr 4,056 <br /> Topsoiling 24 acres of plant/process area <br /> (fresh water pond remains) with scraper <br /> +\- 19,500 cy at$0.82/cy 15,990 <br /> Seeding 24 acres (with fertilizer) <br /> at$415.00/acre 9,960 <br /> Stage 2 Has been reclaimed 0 <br /> Stage 3 Has been reclaimed 0 <br /> Stage 4 Regrading 2500' of levee side slopes to a 3:1 slope <br /> +\-5,500 cy at$0.75 cy 4,125 <br /> Seeding not required, sediment is expected to regenerate <br /> willows and cottonwoods naturally 0 <br /> Stage 5 Has been reclaimed 0 <br /> Stage 6 Currently disturbed, will finish mining in 1995. <br /> Regrading 3500' of 10'highwall to a 3:1 slope with loader, <br /> spread topsoil with loader, finish grade with blade <br /> +\-6,500 cy at$1.25/cy 8,125 <br /> Haul Road Remove 3900'of asphalt with dozer <br /> 10 days at $720/day 7,200 <br /> Grading I I acres with blade at 3 hr/acre and$52/hr 1,716 <br /> Topsoil 11 acres with scraper, 8875 cy at 0.$82/cy 7,278 <br /> Seeding 11 acres (with fertilizer)at$415/acre 4,565 <br /> TOTAL $92,455 <br />