Laserfiche WebLink
r <br />sheet 1 of 2 <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - STRUCTURAL DEMOLITION WORK <br />Task No.: 1 __________________________________________Prepared by NHE <br />Permit No.: M-80-201 Filename M201-1 <br />Date 22-Jul-98 Operation O'Bannon Pit <br />__________________ ________________________________ <br />Permitting action General 112 bond recalculation. <br />_______________________________________________________________________________________________________ <br />Task description Remove structures not approved as permanent. <br />_______________________________________________________________________________________________________ <br />MEANS Location Adjustment: 107.20Y. of base unit costs - MEANS SITE WORK 8 LANDSCAPE LOST DATA 1997 Edition <br />MEANS BASE ADJUSTED <br />STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION ~ DIMENSIONS ~ COMPOSITION I OUANT ITY I UN[T ~ UNIT COST ~ TOTAL LOST <br />___________________________ ___________________I=====_________:.::::.::.I=====___::.::I==::......I=====:==I=====_=:========_______ <br />Batch Plant 8 Office Facilities ~ 15' * 20' * 10' ~ Metal ~ 3,000 ~ cu ft ~ E0.19 ~ 8611 <br />Concrete wall, average reinforcement ~ 30' * 8' * 4" ~ Concrete ~ 240 ~ sq ft ~ E3.92 ~ E7, 009 <br />Concrete slab, on grade w/wire mesh reinforce 130' • 15' * 4" I Concrete I 450 ~ sq ft ~ E2.50 ~ E7, 206 <br />Single pole powerline ~ 300' ~ PowerLine ~ 300 ~ In ft ~. 51.95 ~ E627 <br />----------------------------------------------------------- <br />----------------------------------------------------------- <br />TASK SUBTOTAL - sheet 1 E3,453 <br />