Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />NA ~ No portals or shafts created. <br />L. DRILL HOLE/MONITORING NE LL SEALING <br />Task No.~ Task Description <br />NA ~ No drill holes or monitoring wells created. <br />sheet 4 of 4 <br />Cost (5) <br />____________I____________ <br />Subtotal (K ): <br />Cost (5) <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ <br />__________________________________________________________I_ Cost (E) <br />___________ <br />1 ~ Demolition per attached task 1 worksheet. ~ 53,453 <br />5 ~ Seeding per attached task 5 worksheet. ~ E4, 744 <br />NA Fencing fencing no[ required at this time. <br />6 Mob/Demob per attached task 6 worksheet. ~ <br />_____________________________________________________________ 51,642 <br />___________ <br />Subtotal (M): 59,840 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 513,867 <br />11. INDIRECT COSTS <br />____________ ____________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT ___________ <br />Item No. ~ Item Description ~ <br />_ <br />_____ <br />_ Cost (E) <br />_______ <br />_ <br />______I_______ <br />_ <br />____________________________________I_ <br />1. ~ Public Liability Insurance.... ~1.SSOX of dir. ~ ___ <br />_ <br />5215 <br />2. ~ Contractor's Performance Bond 1.SSOX of dir. ~ 5215 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ E1, 387 <br />4. ~ Job Superintendent..equip. op. serves as super <br />Subtotal (A): 51,817 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 515,683 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ <br />________I__________________________________________________I_ Cost (E) <br />___________ <br />1. ~ Minerals Program Admin. Fee aC S.OOX of cntr.~ 5784 <br />NET INDIRECT COST PERCENTAGE: 18.76X Subtotal (B): 5784 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 52,601 <br />TOTAL PERFORMANCE BONG AMOUNT (direct plus indirect costs): 516,468 <br />