Laserfiche WebLink
<br />FLATSEO TRUCK COST DATA UORKSNEET <br />REV[SION DATE: Au9u5[, 1997 <br />Sheet T of 2 sheets REFERENCES: 1) COST REFERENCE GUIDE <br />' 2) CONTRACTORS EQUIPMENT CDST GUID'. <br />3) COLORADO CONTRACT00.5 ASSOCIATIO: <br />PAGE RATE SCHEDULE <br />NORKSXEET FILENAME: MDFLATBD.4K1 <br />MACHINE DESCRIPTION: GENERIC FLATBED TRUCK 30K GVV, 210 HP, DIESEL, 4%2 <br />COST ADJUSTMENT FACTORS BASE VALUE ADJUSTED VALUE <br />Acquisition Cost: 553,040.00 544,468.74 <br />Economic Life Hours: 10350 8000 <br />Annual Use Hours: 2112 1250 <br />Mech. Labor Cost-Zone 1: 527.15 522.95 <br />-tone 2: 527.15 523.59 <br />Fuel Cost per gat.: 51.07 51.12 <br />Lube Cost: 50.77 50.79 <br />Tire Life Hours: 1800 2000 <br />Tire Purchase Price: 52,214.00 53,076.32 <br /> ~•-• BASE 04NERSHIP 8 OVERHAUL COSTS ----~ ---------------- BASE OPERATING COSTS --- ----- -- <br />BASIC HODEL B <br />______________ ATTACHMENTS <br />____________ ~ DESCRIPTION <br />__________________ ~ DEPRECIATION <br />_________________ OXD/CFC <br />__________ LABOR <br />__________ PARTS <br />______ LABOR <br />________ PARTS <br />________ FUEL <br />_________ LURE <br />_______ TIRES <br />________ G.E. <br />_____ C. <br />__ <br />__________________________ <br />Machine Model No. ~ __________________ <br />30K GVY, 210 HP _________________ <br />53.38 __________ <br />51.83 __________ <br />50.67 ______ <br />51.06 ________ <br />51.12 ________ <br />51.16 ____ <br />54. _____ <br />40 _______ <br />50.77 ________ <br />51.23 _____ <br />50. __ <br />00 <br />Attachment #1 H/A 50.00 50.00 50.00 50.00 50.00 50.00 50. 00 50.00 50.00 50. 00 <br />Attachment #2 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50 :00 50.00 50.00 50. 00 <br />Attachment #3 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50. 00 50.00 50.00 50. 00 <br />BASE COST SUBTOTALS 53.38 51.83 50.67 51.06 51.12 51.16 54.40 50.77 51.23 50.00 <br /> I -- ADJUSTED 04NE.RSH[P 8 OVERHAUL COSTS -I --•----=--- ADJUSTED OPERATING COSTS --- ------- <br />LOST ADJUSTMENT FACTORS ~ FACTOR VALUE ~ DEPRECIATION OND/CFC LABOR PARTS LABOR PARTS FUEL LUKE TIRES G.E.C. <br />Acquisition Cost 0.8384 52.83 N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />Economic Life 1.2938 53.67 N/A 50.87 E1 .37 51.45 51.50 N/A N/A N/A N/A <br />Annual Usage 1.6896 54.79 53.09 N/A N/A N/A N/A N/A N/A H/A ~N/A <br />Double shifts .750depr.-.SOOchd 53.59 51.55 N/A N/A N/A H/A N/A N/A N/A N/A <br />Triple Shifts .667depr.-.333ahd 53.19 51.03 N/A N/A ~ N/A .N/A N/A N/A N/A N/A <br />Nechanic Cost - Zone 1 0.8454 N/0. N/A 50.73 N/A 51.23 N/A H/A N/A N/A N/A <br />- Zone 2 0.8687 N/A H/A 50.75 N/A 51.26 N/A N/A N/A N/A N/A <br />Fuel/Lube/Tire Cost Variable N/A H/A H/A N/A .N/A N/A 54.61 50.79 51.54 50.00 <br />Truck Util. - Zone 1 100.00% N/A N/A 50.73 51.37 81.23 51.50 54.61 50.79 51.54 50.00 <br />- Zone 2 100.00% N/A N/A 50.75 51.37 51.26 51.50 54.61 50.79 51.54 50.00 <br />ADJUSTED COST SU BTOTALS -S.SHIFT -20NE 1: ~ 54.79 53.09 50.73 51.37 51.23 51.50 54.61 50.79 51.54 50.00 <br /> -ZONE 2: 54.79 53.09 50.75 51.37 51.26 51.50 84.61 50.79 51.54 50.00 <br /> -D.SHIFTS-ZONE 1: 53.59 51.55 50.73 51.37 81.23 51.50 54.61 50.79 51.54 50.00 <br /> -20NE 2: 53.59 51.55 50.75 51.37 41.26 51.50 54.61 50.79 51.54 ~ 50.00 <br /> -T.SHIFTS-ZONE 1: 53.19 51.03 50.73 51.37 51.23 51.50 54.61 50.79 51.54 50.00 <br /> -ZONE 2: 53.19 51.03 50.75 51.37 51.26 51.50 54,61 50.79 51.54 50.00 <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />