Laserfiche WebLink
GENERAL MINE PLAN C~LIANCE <br />The amount of area stripped ahead of the pits appears to comply with Trapper's <br />approved operation plan. A-E pit is active in Middle Flume drainage. Brushing <br />ahead of the pit has extended into Middle Flume drainage, consistent with the <br />operation plan as shown on Map M-4 of the permit. There were no more than three <br />spoil ridges at active pits, consistent with the approved operation plan. <br />Transplanted shrub clumps have recently been placed in Oak and Grouse drainages. <br />Page 9 <br />