My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC03148
DRMS
>
Back File Migration
>
Inspection
>
INSPEC03148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:02 PM
Creation date
11/18/2007 8:09:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Inspection
Doc Date
7/21/1997
Doc Name
COAL INSPECTION REPORT
Inspection Date
7/16/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil Topsoil was being stripped in advance of the A-Pit. The topsoil was live handled to the <br />reclaimed portions of the A-Pit and into topsoil pile EE. Additional topsoil removal is necessary <br />for the lower portion of the A-Pit. Topsoil material located adjacent to the B-Pit NOV area has <br />been wind rowed to be spread over the B-Pit ramp. <br />Slides & Damages There are four noted slides at the mine; Mine Entrance Road slump, slide <br />between Pond 006 and Haul Road A, B-Pit Highwall and D-Pit Highwall. All four slides occurred <br />this spring and have not progressed since the last inspection. A technical revision is currently in <br />review for Pond 006. The highwall slides need to be repaired concurrently with reclamation of <br />the pits. The Mine entrance road slide needs to be repaired as soon as possible. <br />Maintenance Items; The following maintenance items were noted; <br />-Rock drains along the mine entrance road require maintenance. <br />-Some additional clean up of G road material is necessary. <br />-Mine Entrance slide should be repaired as soon as possible. <br />-The ME-5 sump contained sediment, and requires cleaning. <br />-NE-3 permanent drainage needs to be reshaped per the designs approved by the Division. <br />-Contour furrows in the A-Pit need to be properly installed and tied into existing drainages, or <br />removed. <br />-Gullies east of neck pit ramp adjacent to topsoil pile GG need to be repaired, as outlined in the <br />rill and gully plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.