My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC02731
DRMS
>
Back File Migration
>
Inspection
>
INSPEC02731
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:45 PM
Creation date
11/18/2007 8:07:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989029
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
4/26/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ~ ~ (Page 41 <br />MINE ID A OR PROSPECTING ID 8 M-1989-029 <br />INSPECTION DATE 3/29/00 ~ INSPECTOR'S INITIALS CLK <br />The Following problems (PBI and/or possible violations (PV) (and suggested corrective <br />actions) were identified during [his inspection. The problems should be corrected by [he <br />cares gLVen, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of a1'_ <br />corrective actions taken. <br />PROBLEMS/POSSiBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />D A'I1: <br />1. Water is being impounded in the concrete storage area. This storage o[ concrete May S, 2000 <br />rubole in water is not covered under the curent permit. and is in contradiction of PB or PV PB <br />Rule 6.4.4(c) of the Construction Materials Rules and Regulations. TOPIC(S) BG <br />CORRECTIVE ACTION: Either a technical revision must be submitted, in <br />cotrtpliance with Rule 3.1.5(9), describing the reclamation measures to be taken in <br />storing the concrete in water, or the water must be drained from this azea within 30 <br />days, and proof of same sent to DMG. <br />2. One of the tanks in the process a[ea did not have a containing hero or tank, and its May S, 2000 <br />convents are unknown. This is in contradiction of Rule 3.1.6 of the Construction PB or PY pB <br />Materials Rules and Regulations, which states that disturbances to the p[evailing ~ TOPIC(S) SF <br />hydrologic balance will be minimized. CORRECTIVE ACTION: Test the tank's <br />contents, and if they are found to be either Cuel or wastes, place a berm or other <br />containment around the tank. Notify DMG of actions taken within 30 days. <br />3. <br /> PB or PV <br /> TOPIC(S) <br />
The URL can be used to link to this page
Your browser does not support the video tag.