Laserfiche WebLink
"• <br />Colorado Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - BULLDOZER NORK <br />Task M: 1 Prep. by: TAS Task Flle Name: M140-1 <br />____________ _________ _________ <br />Dale: 06/09/9'! Pgrm it p:M-R6-190 Mine: Merril Nright Pi[ <br />____________ _________ ___________________ <br />Pexmlc Acclon: Pinal Reclamat lon <br />_______________________________________________ <br />Task Description: Rough grading to 1:1 elope <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DBN <br />Blade Type: UNIVERSAL <br />Attachment N1: ROPS Cab <br />Attachment p2: N/A <br />Horsepower: 2R5 <br />Shift Basis: 1/day <br />Cos[ Breakdown: <br />______________ U[ilizat ion } <br />Ownership coat/hr = $90.32 N/A <br />Operating 6 overhaul Coat/hr- dozer - $51.93 100 <br /> -ripper $0.00 N/A <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr $115 20 Total fleet <br />________ coat/ hr: 5135.20 <br />________ <br />MATERIAL OUANTITIRB <br />Initial Swell Loose <br />Volume: 4,900.0 LCY Factor: N/A Volume: <br />____ 9,400 <br />______ .0 <br />__ LCY <br />_ <br />____________ <br />Source of quantity cake-off: permit <br />________ __________ <br />_________________________ <br />______ <br />__ <br />___________ <br />Source of est. swell factor: program <br />________ <br />_________________________ <br />______ <br />__ <br />___________ <br />HOURLY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg. push distance: 100 f[. ------------------------ ------ -- <br />--------- Operator.......... 0. "IS (avg.) <br />Unadj used hourly Mat. consistency.. 1. 00 (Cat cbl) <br />dozer production: 964 LCY/hr Dozing method..... 1. 00 (gen.) <br />-------- - Visibility........ 1. 00 (avg.l <br />Material tons istency: Job efficiency.... 0. 83 Ilsh/day) <br />Consolidated stockpile Spoil pile Eaetor. 1. 00 (doz-ocl <br />---------------------------- --------- Puah gradient..... 1. 05 (Cat tbll <br />Avg. push gradient: 2.00 } (negl Altitude deration. 1. 00 ICs[ tbll <br />-------- - Material weight... O. T1 ICac tbll <br />Avg. site alt i[ude: 9500 <br />________ Ec. <br />_ Blade type........ <br />________________________ 1. <br />______ 00 <br />__ (S,SU, U) <br />Material weight 3250.00 lb/LCY Net Job Correction 0. 46 <br />Ma[. Descr.: ________ _ ___ ______ __ <br />Gravel - Pi[run Adj uated Unit Prod.: 944. 09 LCY/hr <br />____________________________ _________ <br />Adjus ___ <br />ted Fleet Production: ______ <br />994. __ <br />09 <br />LCY/hr <br />JOB COST --- ------ -- <br />Fleet arze 1 Dozer (sl Total Job Time: 9. 91 Hours <br />________ <br />Unit Cost $0.259 <br />________ <br />/LCY ___ <br />Total JoD Cost: $ <br />___ ______ <br />1,141. <br />______ __ <br />91 <br />__ <br />