Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLDOZ@t NORK <br />Task p: 2 Prep. by: SAS Task Pile Name: M140-2 <br />Date: 06/09/97 Permit p:M-86-140 Mine: Merril Xright Pit <br />Permit Action: Final Reclamation <br />Task Description: Finish grading 3:1 elopes <br />HOURLY EQUIPMENT COST <br />_-_-•••__-__--•••___= Haa is Mach ins: Cat DSN NOraepower : 285 <br /> H lade Type: UNIVERSAL ---------- <br /> Attachment ql: ROPS Cab Shift Baei e: 1/day <br /> Attachment #2: N/A - ---------- <br />Cos[ Breakdown: <br />-------------- Utilization t <br />Owns rahip cos[/hr $90.3] N/A <br />Operating i overhaul coat/hr- dozer - 551.93 100 <br /> -ripper - $0.00 N/A <br />Operator cost/hr - 522.95 N/A <br />Total egpt. wit coat/hr •. $115.20 Total fleet cost/ hr: $115.20 <br />_ <br />IMTER IAL QDANTITIEH ________ _______ <br />Initial Swell Loose <br />Volume: 1,000.0 I .CIf Factor: N/A Volume: <br />_ <br />_ 1,000 <br />____ .0 <br />___ LCY <br />____________ <br />Source of quantity take-off: permit <br />______ ________ <br />_ <br />____ <br />___________ <br />______________ _ <br />_____ <br />___ <br />__________ <br />Source of eat. swell __ <br />Eactor: program <br />______ _ <br />__________________________ <br />_____ <br />___ <br />__________ <br />HOURLY PRODUCTION __ <br />__-•••-______-••= Job Condition Correction Factors <br />Avg. push distance: 100 ft. ------------------------- ----- -- <br />- -------- Operator.......... 0. 75 (avg.) <br />Unadj uet ed hourly Mat. consistency.. 1. 00 (Cat tbl) <br />dozer production: 964 LCY/hr Dozing method..... 1. 00 Igen.l <br />- -------- Visibility........ 1. 00 (avg.l <br />Material consistency: Job efficiency.... D. 61 (lsh/day) <br />Consolidat etl stockpil e Spoil pile factor. 1. 00 (tloz-ocl <br />--------------------- ---------------- Puah gradient..... 1. 02 ICat [bll <br />Avg. push gradient: 1.00 t Ineg) Alt i[ude derat ion. 1. 00 (Cat tbl) <br />- -------- Material weight... 0. 71 (Cat tbl) <br />Avg. site altitude: 9500 ft. <br />__ Blade type........ <br />__ <br />__ 1. 00 <br />__ IS, SU, UI <br />_ <br />Material weigh[ ______ <br />7250.00 lb/LC) _______ <br />__________ <br />____ <br />Net Job Correction _____ <br />0. 95 <br />Mat. Deac r.: _ ________ ____ _____ __ <br />Gravel - Pitrun Adjusted Unit Prod.: 934. 09 LCY/hr <br />_____________________ ________________ <br />Adjus ____ <br />ted Fleet Production: _____ <br />434. __ <br />09 <br />LCY/hr <br />JOB COST ---- ----- -- <br />= Fleet size 1 Dozer lsl Total Job 'lime: 2. 70 Hours <br />_ <br />Unit CosC _______ <br />$0.265 /LCY ____ <br />Total Job Cos[: _____ <br />$265. __ <br />39 <br />