Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />Topsoil Stock~es <br />No gullying was observed on any of the topsoil stockpiles. Topsoil stockpile signs were up, although <br />the topsoil sign at the west mine fan needs to be attached to its post. <br />Facilities <br />The coal haul trucks were operating from the Bowie No.2 Mine to the train loadout. No problems with <br />fugitive dust were observed. <br />There were no problems with any of the facilities. The voltune of coal at the highway coal stockpile <br />will be reduced soon. The longwall at the Bowie No. 2 Mine will be moved at about the beginning of <br />May. The process will take about three weeks. During that time, the stockpi]ed coal will be used for <br />shipments. <br />,L <br />Slone Stabiliri <br />No signs of slope instability were observed. <br />Records <br />The records were found to be in compliance. <br />c:\ms97\bowie L\insp0400 <br />