Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />Culvert 2A. Please make necessary repairs to this drainage to prevent further erosion from <br />occurring. <br />Culverts SSA, ~'3A, 31 A, and 1 ~A will require maintenance in the near future to ensure that they <br />are functioning as intended. All other culverts site wide were clear of sediment and/or debris and <br />appeared to be in good working condition. Culvert SSA was full of sediment on both the inter <br />and outlet sides. The inlet side of Culvert ~4A is crushed and shou]d be repaired. The discharge <br />end of Culvert 31 A is crushed and does not appear to properly convey discharge. There is a large <br />hole in the top of Culvert I>A. A portion of the roadway has eroded, and the top of the culvert is <br />damaged on the inlet side. Please make the necessary repairs to these culverts as soon as weather <br />allows. <br />Stockponds T-29, T-28, T-32, T-1 ~, and T-7 were inspected, and all appeared to be functioning <br />properly. Stockpond T-29 was completely full and was dischazging from the spillway. <br />Significant erosion has occurred in the channel of the spillway. Additional riprap needs to be <br />placed in the spillway and the channel needs to be repaired. A significant spring/discharge was <br />noted at the base of the hill immediately north of the drainage channel, approximately 1 f8 mile <br />northwest of T-29. Stockpond T-7 contains a large amount of sediment and should be cleaned <br />out as soon as weather permits good access to the Stockpond. <br />Tai psotl <br />Some rills are beginning to form in the Wolf Creek reclaimed azea, specifically on the hillside <br />west of Stockpond T-29 and on the hillside west and south of Stockpond T-32. Please continue <br />to monitor erosion in azeas where topsoil has been replaced and implement appropriate measure <br />to reduce erosion at these locations. <br />