Laserfiche WebLink
Step 8 Continue all approved surface water quality 30 October 2006 30 October 2006 <br /> monitoring as required by CDPHE; provide <br /> to CDRMS a copy of the September 2006 <br /> DMR for ermit # 0027154 <br />Ste 9 (divided into Ste s 9a and 9b <br />Step 9a Re-establish and document temporary storm 17 November 17 November <br /> water storage and discharge capabilities 2006 2006 <br /> consistent with the a roved desi n <br />Step 9b Remove coal fines accumulation from north 31 January 2007 <br /> pond azea and dispose of coal fines in <br /> existin coal refuse dis osal area <br />Step 10 Submit as-built (as-repaired) Pond E 9 February 2007 <br /> drawin s. <br />Step 11 Report, in writing, completion of Foidel 9 February 2007 <br /> Creek cleanu <br />C-1982-056. CC Inspection of 17 January 2007, Page 9 of 14 pages. BGW <br />