Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and date of <br />abatement for the violation, previous violations still requiring abatement and the termination of violations cited <br />during previous inspections. <br />There were no violations noticed during, and no notice of violation was issued as a result of, this <br />inspection. <br />Notice of Violation (NOV)number CV-2006-006 was issued from the Division office on <br />September 18, 2006. Required abatements dates and dates of abatement are: <br />Abatement Date Required Date Abated <br /> b <br />Ste Descri tion <br /> <br />Step 1 Cease discharge of thickener underflow to 13 September 13 September <br /> Sedimentation Pond E. 2006 2006 <br />Step 2 Repair the thickener underflow pipe. 13 September 13 September <br /> 2006 2006 <br />Step 3 Perform immediate damage control activities 13 September 13 September <br /> on Foidel Creek. 2006 2006 <br />Step 4 Notify CDPHE, CDOW and the CE of this 13 September 13 September <br /> event. 2006 2006 <br />Step 5 Notify downstream water users (demonstrate 29 September 22 September <br /> to the Division . 2006 2006 <br />Ste 6 divided into Ste s 6a throu h 6f) <br />Step ba Assess the Sedimentation Pond E discharge 13 October 2006 13 October 2006 <br /> includes sam lin of the dischar e <br />Step 6b Assess the receiving stream water quality of 10 October 2006 10 October 2006 <br /> Foidel Creek and Trout Creek (includes <br /> sam lin of Foidel Creek and Trout Creek) <br />Step 6c Contain the coal fines discharge 29 September 13 September <br /> 2006 2006 <br />Step 6d Assess the potential toxicity impacts, 6 October 2006 3 October 2006 <br /> including documentation of the chemical <br /> constituency of the discharged material, to <br /> Foidel Creek and Trout Creek <br />Step 6e Provide an estimate of the total slurry (water 13 October 2006 13 October 2006 <br /> plus solids) volume discharged to Foidel <br /> Creek <br />Step 6f Submit a written report of this information 16 October 2006 16 October 2006 <br /> to the Division <br />Ste 7 Submit coordinated lans for abatement. 10 October 2006 6 October 2006 <br />C-1982-056. CC Inspection of 17 January 2007, Page 8 of 14 pages. BGW <br />