My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC02005
DRMS
>
Back File Migration
>
Inspection
>
INSPEC02005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:10 PM
Creation date
11/18/2007 8:03:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/2/1996
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) • <br />MINE ID # OR PROSPECTING ID # !l-90-098 <br />INSPECTION DATE 2 2 96 INSPECTOR'S INITIALS CLK <br />The following problems (PH) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br /> PROBLEMS/POSSIBLE VIOLATIONS <br /> AND <br /> CORRECTIVE ACTIONS <br /> CORRECTION <br /> DATE <br />1. The operator has mined into the setback for the April 25, 1996 <br /> southern boundary. This is a possible violation of the PB or PV PV <br /> mining plan and C.R.e. 34 -32.5-116(1) for failing to TOPIC(S) MP <br /> perform the reclamation as prescribed by the <br /> reclamation plan. <br />2. The operator has not mined the pit at 3:1 elopes, ae April 25, 1996 <br /> agreed to in the mining plan. This is a possible PB or PV PV <br /> violation of the mining plan and C.R.S. 34-32.5-116(1) TOPIC(S) BG <br /> and (4)(a), for failing to perform the reclamation ae <br /> prescribed by the reclamation plan, and failing to <br /> carry on grading so ae to create an appropriate final <br /> topography. <br />3. The topsoil stockpiles are covered with cheatgraes May 6, 1996 <br /> instead of western wheatgraes. These stockpiles must be PB or PV P~ <br /> treated for the cheatgraes infestation, and reseeded TOPIC(S) TS <br /> with western wheatgraee, or more bond moat be posted to <br /> compensate for inadequate stockpile material. <br />4. The bond will be refigured based on observations made <br /> during this inspection. The operator may either poet PB or PV PB <br /> adequate bond at that time, or complete reclamation TOPIC(S) FW <br /> work commeasurate with the currently posted bond. This <br /> is in accordance with Rule 4.2.1(1) and (2) of the <br /> Construction Materials Rules and Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.