Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task #... 4 Prep. by WHE FiLename..M013-4 <br />Date..... 29-May-98 Permit # M-83-013 Mine......Latham Burkett Pit <br />_____-______ ________ ____________________ <br />Permit Action........ General 112 band recalculation. <br />Task Description..... Haul reclamation equi Anent to and from jab site. <br />HOURLY EQUIPMENT COST <br />Mob/Demob Eqp. -Tractor <br />-Lt. Trailer <br />-Med. Trailer <br />-HVy. Trailer <br />-Pilot Car <br />-Hyd. Crane <br />-Fuel Truck <br />-Cube Truck <br />-Flatbed Truck <br />NOTE - This is a list to sel ecr from, not a list of mandatory items [o include. <br />6x4, 75,000 lb GVY, 375 HP, diesel powered <br />25 ton folding gooseneck, drop deck <br />50 ton folding gooseneck, drop deck <br />120 Ton folding gooseneck, drop deck <br />On-highway Light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br />6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />30,000 lb CVII, 210 HP, diesel powered <br />Last Update: _____________________________________________________________________________________ <br />August, 1997 (trucks) <br />--------------------- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Lost Breakdown: <=25 T, 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = 525.59 528.10 531.38 51.73 524.12 56.88 512.66 57.88 <br />Operating Cost/hr = 528.38 530.17 532.34 54.82 531.48 519.57 525.56 511.82 <br />Operator Cost/hr = 522.61 522.61 522.61 521.82 523.13 522.35 521.24 522.35 <br />Helper Cost/hr = 521.82 521.82 521.82 50.00 50.00 50.00 50.00 50.00 <br /> ~TOtal = 598.40 5102.70 5108.15 528.37 578.73 548.80 559.46 542.05 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />---------- <br />---- <br />-------------------------- <br />CAT D8N SU-Blade ------------- <br />39.50 ---------- <br />543.36 ----------- <br />5102.70 --------------------------- <br />1 5146.06 ---- <br />-------- <br />5102.70 <br />Revegetati on Equipment 10.00 510.00 598.40 1 5108.40 598.40 <br />-------------------------------------------------------------------------------------------------------------------- <br />Subto[als 5254.46 5201.10 50.00 <br />