Laserfiche WebLink
ROADABLE EDUI PMENT: ~ Sheet 2 of 2 <br />------------------ Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cast/hr (no. hauled) Cost/hr Cost/hr <br />NA <br />___________________________ ____________ __________________ _______________________ <br />Subtotals E0.00 E0.00 <br />MOB/DEMOB SUPPORT EQUIPMENT: --------- --------- <br />--------------------------- Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cos[/ea <br />NA <br />Subtotals 50.00 E0.00 E0.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />Flatbed Truck E42.05 1 E42.05 E42.05 <br />------------------------------------------------------------------------------------------------------- <br />SubtotaLs E42.05 E42.05 <br />EQUIPMENT HAUL DISTANCE 8 TIME <br />______________________________ <br />______________________________ <br />Nearest major city or town within project area region: Grand Junction <br />Total one way travel distance = 28.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= <br />0.56 hours haul <br />0.50 hours unload <br />0.56 hours return <br />JOB COST <br />Total Mob/Demob Cost = E1,113.34 <br />so.oo mpn. <br />N/A hours load <br />0.56 hours haul <br />N/A hours unload <br />0.56 hours return <br />NOTE: Nan-roadable equi Anent (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equi Anent on certain <br />specified road segments with in .the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equi Amen[ which must be <br />partially dismantled for transport and re-assembled at the job site. Losts for lifti n9 equipment and other <br />support equipment needed for [his work should be included in the mob/demob costs. <br />