My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC01689
DRMS
>
Back File Migration
>
Inspection
>
INSPEC01689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:56:51 PM
Creation date
11/18/2007 8:01:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983084
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
9/28/1995
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 5) <br />MINE ID f OR PROSPECTING ID f M-83-084 <br />INSPECTION DATE 9-28-95 INSPECTOR'S INITIALS GSC <br />PB-3 Refuse consisting of scrap iron and discarded equipment 12-22-95 <br />was observed in the equipment and machinery storage PB or PV PB <br />areas. Waste oil stained soil was observed in the TOPIC(S) AT <br />equipment storage areas. Several fuel storage tanks <br />were also observed in these areas with no spill <br />containment structures. <br />Corrective Action: The contaminated soil needs to be <br />removed and properly disposed and a copy of the bill of <br />lading or landfill receipt provided the Division. All <br />fuel tanks on site moat have appropriate spill <br />containment structures. The refuse needs to be <br />disposed of pursuant to Rule 3.1.5(5). Submit <br />photographic verification of all of the above to the <br />Division no later than December 12, 1995. <br />PB-4 A diesel generator, 55 gallon fuel tank, and pump are 12-22-95 <br />located adjacent to the Middle Fork of the South Platte PB or PV PB <br />River. There ie no spill containment etructu re for the TOPIC(S) HB,AT <br />fuel tank and the ground along the bank of the Middle <br />Fork has been stained from fuel spillage. <br />Corrective action: The contaminated Boil will need to <br />be removed and properly disposed and the fuel tank moat <br />be placed in a spill containment structure in order to <br />minimize disturbances to the quality of surface and <br />ground water. Verification must be submitted to the <br />Division in the form of photographic evidence and a <br />copy of the bill of lading or receipt for the <br />contaminated soil from an approved landfill no later <br />than December 12, 1995. <br />PB-5 The operator does not have a stormwater permit or 12-22-95 <br />verification that one is not needed. PB or PV PB <br />TOPIC(S) SW <br />Corrective Action: Submit verification to the Division <br />that a stormwater plan has been filed with the <br />Department of Health (or verification that one ie not <br />needed) no later than December 12, 1995. <br />
The URL can be used to link to this page
Your browser does not support the video tag.