Laserfiche WebLink
• y ~ IPage 61 • <br />MINE ID # OR PROSPECTING ID # M~3-759 <br />INSPECTION DATE 2/21/97 INSPECTOR'S INITIALS WHE <br />CORRECTIVE ACTION: Ensure mine identification sign is posted at the entrance to the permit <br />area and displays the information required by Rule 3.1.1211-. Post and maintain affected area <br />perimeter markers, as required by Rule 3.1.12121. <br />4/7/97 <br />PB or PV PB <br />TOPIC(S) SM <br />4. Protective vegetative cover for the stockpiled topsoil was sparse or absent. <br />CORRECTIVE ACTION: Take appropriate measures to ensure establishment of protective <br />vegetative cover for all topsoil stockpiles to remain stockpiled for periods of time exceeding 1 <br />year, as required by Rule 3.1.911-. <br />4/30/97 <br />PB or PV PB <br />TOPIC(S) TS <br />5. Elevated fuel tank, several 55-gallon drums and pallet of bagged fertilizer were located within <br />the pit. Spill containment structures were not observed for any of the fluid storage areas. <br />CORRECTIVE ACTION: Ensure all fuels, lubricants and chemicals are stored in a controlled <br />manner, at a designated location, with adequate spill prevention and spill containment controls, <br />sufficient to protect ground and surface waters from spills and/or rupture of containers. <br />4/30/97 <br />PB or PV PB <br />TOPIC(S) AT <br />HB,_,_ <br />6. Review and recalculation of the required bond for reclamation of this operation will take place <br />over the next few months. A detailed estimate of the recalculated cost, based on the approved <br />mining and reclamation plans and conditions observed during the inspection, will be forthcoming. <br />CORRECTIVE ACTION: No response required from the operator at this time. <br />lend of report) <br />CERTIFIED MAIL N0. P 332 109 021 <br />Return Receipt Requested <br />