My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC01053
DRMS
>
Back File Migration
>
Inspection
>
INSPEC01053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:56:28 PM
Creation date
11/18/2007 7:58:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983159
IBM Index Class Name
Inspection
Doc Date
3/3/1997
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/21/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• y ~ IPage 61 • <br />MINE ID # OR PROSPECTING ID # M~3-759 <br />INSPECTION DATE 2/21/97 INSPECTOR'S INITIALS WHE <br />CORRECTIVE ACTION: Ensure mine identification sign is posted at the entrance to the permit <br />area and displays the information required by Rule 3.1.1211-. Post and maintain affected area <br />perimeter markers, as required by Rule 3.1.12121. <br />4/7/97 <br />PB or PV PB <br />TOPIC(S) SM <br />4. Protective vegetative cover for the stockpiled topsoil was sparse or absent. <br />CORRECTIVE ACTION: Take appropriate measures to ensure establishment of protective <br />vegetative cover for all topsoil stockpiles to remain stockpiled for periods of time exceeding 1 <br />year, as required by Rule 3.1.911-. <br />4/30/97 <br />PB or PV PB <br />TOPIC(S) TS <br />5. Elevated fuel tank, several 55-gallon drums and pallet of bagged fertilizer were located within <br />the pit. Spill containment structures were not observed for any of the fluid storage areas. <br />CORRECTIVE ACTION: Ensure all fuels, lubricants and chemicals are stored in a controlled <br />manner, at a designated location, with adequate spill prevention and spill containment controls, <br />sufficient to protect ground and surface waters from spills and/or rupture of containers. <br />4/30/97 <br />PB or PV PB <br />TOPIC(S) AT <br />HB,_,_ <br />6. Review and recalculation of the required bond for reclamation of this operation will take place <br />over the next few months. A detailed estimate of the recalculated cost, based on the approved <br />mining and reclamation plans and conditions observed during the inspection, will be forthcoming. <br />CORRECTIVE ACTION: No response required from the operator at this time. <br />lend of report) <br />CERTIFIED MAIL N0. P 332 109 021 <br />Return Receipt Requested <br />
The URL can be used to link to this page
Your browser does not support the video tag.