Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the Inspection. The comments include discussion of observations <br />made during the Inspection. Comments in Section IV describe any enforcement actions <br />token during the Inspection and the facts or evidence supporting the enforcement action. <br />BACKFILL AND GRADING Backfilling and grading from the demolition of the bases of the <br />water-monitoring flumes on North Thompson and Middle Thompson creeks was complete. <br />Pictures 290. 291 and 292 are of me reclamation work at me upper flume site on North <br />Thompson Creek, Picture 294 is of The reclamation work ai the lower flume site on North <br />Thompson Creek, 295 is of the reclamation work ai the lower flume site on Middle Thompson <br />Creek, and 296 and 297 of the reclamation work at the upper flume site on Middle Thompson <br />Creek. <br />81025, Pege _5_ of _B_ Pages, (date) _Apr~l 23, 2003_, tin itials) _BOW <br />