Oc ( s( <br />Roadside Mine (Permit No. C-1981-041) <br />Bond Release SL-02 <br />May 20, 2003; 9:00 - 4:30 <br />May 21, 2003; 8:30 - 12:00 <br />Participants: <br />Kerry Horton, Bank of Grand Junction (lrst day only) <br />Rudy Fontanari, landowner (lrst day only) <br />Bruce Fowler, BLM (lrst day only) <br />Keith Davis, AEP (parent company) <br />Velma Hays, adjoining landowner <br />Tonya Hammond, operator <br />Dan Matthews, Colo DMG <br />Randal Pair, OSM <br />Day 1. <br />The outslopes of the Roadside Refuse Pile have been completed <br />and covered. Dan Matthews has done considerable work in the <br />last few months verifying cover depths, terrace slopes, etc., so <br />we did not repeat that work. The top of the pile was being used <br />for storage and has not yet been covered; it is not included in <br />this bond release. The new clean water diversion ditch above <br />the pile is OK. <br />Dan Matthews pointed out the location of the prep plant that has <br />been removed; at the time, I apparently did not realize that <br />this area had to be backfilled and graded as part of reclaiming <br />the upper bench. <br />The North Decline area has been restored to AOC, and the stream <br />channel reconstructed. <br />After lunch, we checked the "B" substation site, which had been <br />restored to AOC and all facilities removed. We also checked the <br />borrow area for the Roadside Pile cover material; it has been <br />restored to AOC. <br />We checked the facilities at the south area on BLM surface. The <br />substation area has been regraded and resoiled, and all <br />facilities removed. The soil stockpile area is OK. The two <br />West Portals have been sealed and backfilled; no settling was <br />observed. Revegetation is very sparse on these areas. The road <br />crossings have been upgraded with riprap as earlier requested by <br />~~ ~ S <br />