Laserfiche WebLink
Southfield C-81-014 <br />13 Jan 04 ~~ <br />Page 2/2 <br />Hydrologic Balance (cont.): -The two ponds at the loadout were dry at the time of <br />the inspection. The pond embankments were well vegetated and in good condition <br />and showed no signs of erosional problems. <br />Backfilling and Grading: -The backfilled facilities areas remain stable. No cracking or <br />settling has been observed in the backfilled areas. There were no erosional problems <br />observed on these areas. There have been several snow storms this winter and the <br />areas remain in good condition. <br />