Laserfiche WebLink
• iii iiiiiiiiiiiu iii • <br />999 <br />oF~~o~ <br />'~~~ ~ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />#* *~ MINERALS PROGRAM INSPECTION REPOF~ <br />PHONE: (3031866-3567 Fc / <br />``a'6 • OCT V~1VER <br />/y•/ /~ r <br />~ /s ,7An?JCCI~;G <br />The Division of Minerals and Geology has conducted an inspection of the mining operationY~e~i below. This report <br />documents observations concerning compliance of the mining operation with the permit and the reg19~6L~jns of the Mined <br />Land Reclamation Board. The report notes 11 Areas of successful compliance; 2) Problems and sugge$ted corrective <br />actions and/or 31 Possible violations to be considered for possible enforcement action by the Mined Land Reclamation <br />Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE CORRECTIVE ACTION <br />ANDIOR RESPONSES TO THE DIVISION IN ORDER TO AVOID CONSIDERATION OF POSSIBLE ENFORCEMENT ACTION <br />BY THE MINED LAND RECLAMATION BOARD <br />MINE NAME: Rubv Trust Mine OPERATOR: Walker Minino & Milliner <br />COUNTY: Ourav MINERAL: Au. Aa, Pb TYPE OF OPERATION: Underground 110121 <br />INSPECTORISI: Wallace H. Erickson <br />MINE ID J1 OR PROSPECTING ID Il: M-1979-181 G~ <br />9f <br />l~~ `~ do <br />INSPECTION DATE 9 1/ 5/00 DATE OF COMPLAINT NA <br />INSPECTOR'S INITIALS WHE TIME OF DAY (MILITARY) 1230 <br />INSPECTION TYPE CODE"' MI POST INSP. CONTACTS131 NO <br />JOINT INSP. AGENCY CODE"I NO REASON FOR INSP. CODEI'~ IE <br />WEATHER CODE101: CL BOND CALCULATION TYPE161: BP <br />OPERATOR REP. PRESENT: None Present <br />t. INSPECTION TYPE CODE -ICL-IN: IL=)))opal Operatbn, MI=Monhainp, MP=Mineral Prospect, SI=Suretytdeted, PR=Pre-operation) <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTON AGENCY CODE -ICL-AG: NO=None, BL=BLM, CH=Cab. Dept. Hedth; CL=Lord <br />Board, CT=Cit¢an: CW=W7dlife, FS=Faeat Servbs, HW=Hwy. Dept., LG=Local Government, SE=State Enpr.l <br />3. REASON FOR INSPECTION CODE - ICL+$: AG=Other Agency Request, CT=Cit¢an Complain, IE=Nanul I&E Program, HP=High Priority, <br />PY =Priority] <br />4. WEATHER CODE -ICL-WE: CL=Cloudy, CR=Clear, IN=lndsment - prevented irrpeetion, RN=Rainirq, SN=Snowirq, WD=Windy) <br />6. BOND CALCULATION TYPE CODE -IBC=Complete Bond, BP=Partial Bond, NN=None] <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. IF PB <br />OR PV IS INDICATED, YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND REGULATIONS. If PV is indicated, you will be notified <br />under separate cover when the Mined Land Reclamation Board will consider possible enforcement action. <br />GENERAL INSPECTION TOPICS <br />IARI RECORDS .................................. . Y IFNI FINANCIAL WARRANTY..... .... Y IRD) ROADS..................... . Y <br />IHBI HYDROLOGIC BALANCE ............. . Y IBGI BACKFILL & GRADING ....... .... Y IEXI EXPLOSIVES............. . N <br />IPWIPROCESSING WASTE(fAILINGS.. . Y ISFI PROCESSING FACILITIES.... .... Y ITSI TOPSOIL ................... . Y <br />(MPIGENLMINE PLAN COMPLIANCE.. . Y (FWIFISH & WILDLIFE ............... .... N IRVI REVEGETATION........ . Y <br />(SMISIGNS AND MARKERS ............... . Y ISPI STORM WATER MGT PLAN .... N ISBI COMPLETE INSP...... .. Y <br />IESI OVERBURDENIDEV. WASTE ....... . Y ISCI EROSION/SEDIMENTATION .... Y IRSI RECL PLANICOMP..... . Y <br />IATI ACID OR TOXIC MATERIALS ...... . Y IODI OFF-SITE DAMAGE ............ .... Y ISTI STIPULATIONS ........ .. NA <br />Y=Inspected and Found in Compliance PV =Inspected and Possible Violations Noted PB =Inspected and Problems Noted <br />N =Not Inspected NA =Not Applicable <br />WHITE -PUBLIC FILE YELLOW -OPERATOR PINK -CORRESPONDENCE FILE <br />