Laserfiche WebLink
a <br />Mr. Allen Weaver, Mine Engineer -5- March 30, 1994 <br />Energy Fuels Mining Company _ <br />The Division is concerned that runoff quantities generated by precipitation larger than <br />the 10-year, 24-hour event might overtop Watershed Diversion 1 at the junction of <br />ditch Sections C and D. Failure of Watershed Diversion 1 at this location could <br />endanger the sediment pond directly below the coal refuse pile. Please redesign this <br />section of Watershed Diversion 1 to convey the 100-year, 24-hour event. <br />If you have any questions please give me a call. <br />Sincerely, <br /> <br />Wallace H. Erickson <br />Environmental Protection Intern <br />cc: Dan Hernandez, DMG <br />M:\O SS\amm\W eever.whe <br />