My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC00290
DRMS
>
Back File Migration
>
Inspection
>
INSPEC00290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:49 PM
Creation date
11/18/2007 7:54:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Inspection
Doc Date
3/30/1994
Doc Name
letter about what was discussed at FEBRUARY 24 1994 on-site MEETING
From
DMG
To
ENERGY FUELS MINING CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ~ <br /> <br />STATE OF III IIIIIIIIIIIII III <br />999 <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1313 Sherman Si.. Room 215 <br /> <br />Denver, Colorado 8020] ~~~~~ <br />Phone: (3031 866-3567 <br />FA%.13031832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br />March 30, 1994 <br /> Roy Romer <br />Mr. Allen Weaver c°"e`°°` <br />Mine En ineer <br />9 Re°saiara` <br />Eaecuuve Director <br />Energy Fuels Mining Company Michael 8. Long <br />P.O. Box 449 D~.~~i°n Direao~ <br />Florence, CO 81226 <br />Re: February 24, 1994 Meeting at Raton Creek Mines <br />Energy Fuels Mining Company, Raton Creek Mines, Permit No. C-82-055 <br />Dear Mr. Weaver: <br />The purpose of this letter is to record the issues discussed during our meeting at the Raton <br />Creek Mine on February 24, 1994. Individuals present at that meeting included: <br />Mr. A.J. luppa, landowner; <br />Mr. Joe De Angelis, EFMC; <br />Mr. Clint Carey, EFMC; <br />Mr. Allen Weaver, EFMC; <br />Mr. Tony Waldron, DMG; and <br />Mr. Wallace Erickson, DMG <br />Issues discussed during the meeting include: <br />1. Phase I bond release requirements for the east side of the yard area where backfilling <br />operations of the Mine 1 portals had been completed; <br />2. Phase II bond release requirements specifically dealing with topsoil replacement; <br />3. Mining related structures not previqusly approved as permanent structures but <br />requested by the landowner to remain as permanent structures; and <br />4. Watershed Diversion Ditch 1 maintenance and design. <br />A brief description of the four basic issues follows. <br />1. Phase I bond release requirements for the east side of the yard area. <br />Rule 3.03.1(2)lal states, "Up to sixty percent of the applicable bond amount shall be <br />released when the permittee successfully completes backfilling, regrading, and <br />drainage control in accordance with the approved reclamation plan." <br />
The URL can be used to link to this page
Your browser does not support the video tag.